Task and existing conditions
Agree temporary collective edge protection for a specific work area and period of use. The layout, substrate and construction sequence are part of preparation.
What the service covers
Temporary edge protection is considered for a specified work area and period of use. The layout, supporting surfaces and construction sequence form the basis for coordination. Installation and subsequent dismantling are planned together. Photographs and documentation of the roof or structure help describe the specific installation situation.
Plan access and the workflow together
The work area, roof or building construction and future use are considered together. Plans, views and information about the intended period help with preparation. Coordination connects the structural conditions with the agreed scope of installation and use.
Information that helps with your enquiry
- Plans or photographs of the proposed layout
- Existing roof or building construction
- Required use and period of need
You can send up to five photos or documents with the enquiry form. The precise scope of work and next steps are agreed in person.
